Facility | Client | Development Stage | Year | Remark |
Electric Desalter (ЭЛОУ) , Atmospheric and Vacuum Distillation Units (АВТ), and Bitumen-Production Units within Paraffin Solvent Production Unit (UPRP) | JSC "LUKOIL-Kogalymneftegaz"
Kogalym |
Detailed Design | 1994 | Commissioned in 1997 |
Revamping of the Atmospheric Distillation Column of Atmospheric and Vacuum Distillation Unit,
JSC "BITRAN", Ukhta
|
RPE "PETON"
Orsk |
Detailed Design | 1996 | Commissioned in 1996 |
Revamping of Crude Oil Stabilization Unit (USN -1500) | CJSC "Stabilizatsia"
Nizhnevartovsk |
Business Plan | 1997 | |
Revamping of Oil Stabilization Unit (USN 4-1) to increase its Feed Capacity to 2.0 million tpy
LLC "Nizhnevartovsk RPE", Tyumen Oil Company
|
Volgograd Company "Neftezavodmontazh"
Volgograd |
Detailed Design | 1998 | Commissioned in 1999 |
Revamping of the Atmospheric Distillation Unit in Astrakhan Gas Processing Plant | JSC "Delta"
Austria |
Technical and Economic Assessment | 1998 | |
Revamping of 2.0 million tpy Oil Stabilization Unit
(USN 4-2) (ЭЛОУ-АТ) LLC "Nizhnevartovsk RPE", Tyumen Oil Company
|
Volgograd Company "Neftezavodmontazh"
Volgograd |
Detailed Design | 1999 | Commissioned in 2000 |
Upgrading of Column Equipment with replacement of internals | Orenburg Gas Processing Plant OJSC "Orenburggazprom" | Technical Design | 1999 | Commissioned in 1999 |
Revamping of Gas Condensate Stabilization Unit
(GS-2)
|
State-run enterprise "Turkmengaz"
Turkmenia |
Technical and Commercial Proposal | 1999 | |
Revamping of Atmospheric and Vacuum Distillation Unit | OJSC "LUKOIL-Odessa Refinery"
Odessa, Ukraine |
Technical and Commercial Proposal | 2000 | |
Additional equipment of AT-1 Unit to increase its capacity to 3.2 million tpy OJSC "LUKOIL-Ukhtaneftepererabotka" | OJSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don |
Detailed Design | 2000 | Commissioned in 2001 |
Revamping of Electric Desalter, Atmospheric and Vacuum Distillation Unit to increase its capacity to
2.1 million tpy OJSC "LUKOIL-Odessa Refinery"
|
OJSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don |
Process Part of Detailed Design | 2000 | Commissioned in 2001 |
Yuzhno-Shapkinskoye Field Crude Oil Treatment Unit | Petrofac LLC
Great Britain |
Detailed Design Documentation | 2002 | Commissioned in 2004 |
Technical support in operation of Kogalym Refinery. Obtaining of Process Operating Regulations Approval for Paraffin Solvent Production Unit (ЭЛОУ-АВТ) | CJSC "Kogalymneftegas" | Technical Assistance | 2003 | |
Major turnaround of ЭЛОУ АВТ-2 Unit with capacity
2.2 million tons/year
|
OJSC "Khersonnefte-pererabotka"
Kherson, Ukraine |
Detailed Design | 2004 | Commissioned in 2004 |
Upgrading of ЭЛОУ-АВТ-6 Unit under Koh-Glitsch Basic Design at the Refinery OJSC "Angarsk Petrochemical Company" | OJSC "Angarskneftechim-proekt"
Angarsk |
Detailed Design Documentation | 2006 | |
Turn-key construction project of Crude Stabilization Unit USN-500 (500 000 tpy capacity) at oil and gas transshipment complex | CJSC “Syntez-Oil” | Technical Annexes to the Contract | 2007 | |
Revamping of shop No.3 column section and installation of reboilers | LLC "Nizhnevartovsk RPC"
Nizhnevartovsk |
Detailed Design | 2007 | FAU "RF Glavexpertiza" positive conclusion |
Major turnaround and revamping of fuel oil Vacuum Distillation Unit No.1 (VT-1) at Turkmenbashi Refinery with increase in capacity up to 1.6 million tpy | LLC "Elitstroy" | Detailed Design | 2007 | |
Elaboration of BEDD for Electric Desalter for preparation of Russian oil refining and chemical engineering corrosion prevention system for cooler-condenser equipment of Atmospheric Distillation Columns of ELOU-AVT Unit with capacity 500 000 tpy, town of Volkhov | LLC "Volkhovneftechim" | Elaboration of BEDD | 2007 | |
Revamping of vacuum section of electric desalter АВТ (ЭЛОУ-АВТ) unit at
OJSC "Khabarovsk Oil Refinery" |
OJSC "Khabarovsk Oil Refinery" | Detailed Design Documentation | 2012 | |
Revamping of heat exchange circuit of ЭЛОУ-АВТ-2.5 unit at OJSC "Novoshakhtinsk Petroleum Product Plant" | OJSC "Novoshakhtinsk Petroleum Product Plant" | Detailed Design Documentation | 2012 | |
Revamping of electric desalter АВТ (ЭЛОУ-АВТ) unit at OJSC "Khabarovsk Oil Refinery" | OJSC "Khabarovsk Oil Refinery" | Detailed Design Documentation | 2013 |
Facility | Client | Development Stage | Year | Remark |
Revamping of the Л-24-8 Unit for
LLC "LUKOIL- Volgogradneftepererabotka" |
R&D Center of Oil Company "LUKOIL"
Moscow |
Feasibility Study | 1996 | |
1.0 million tpy Diesel Oil Hydrotreating Unit | LLC "LUKOIL-Volgograd-
neftepererabotka" Volgograd |
Technical and Commercial Report | 1996 | |
Upgrading of ЛЧ-24-2000, ЛГ-24-7, Л-24-6 Units | JSC "KINEF"
Kirishi, Leningrad Region |
Technical and Commercial Proposal | 1996 | |
1.4 million tpy Diesel Hydrotreating Unit
(P -24-1400/1) for LLC "LUKOIL-Volgogradneftepererabotka" |
JSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don |
Detailed Design | 1997 | Commissioned in 2000
Licensor - UOP |
Upgrading of Stabilization Section in
ЛЧ -24-2000 Unit |
JSC "Moscow Refinery"
Moscow |
Technical and Commercial Proposal | 1997 | |
Addition of Gas/Air Catalyst Regeneration Section to Л-24-6 Unit | OJSC "Cracking"
Saratov, OC "Sidanko" |
Detailed Design | 1998 | Commissioned in 1998 |
Upgrading of Hydrogen Concentration Section of ЛЧ-24-2000 Diesel Oil Hydrotreating Unit | OJSC "Moscow Refinery"
Moscow |
Detailed Design Documentation | 1999 | Commissioned in 2000 |
Upgrading of Л-24-6 Unit | OJSC "Saratov Refinery"
Saratov, OC "Sidanko" |
Justification of Investments | 2001 | |
Revamping of Л-24-5 Hydrotreating Unit with replacement of reactors and heaters | OJSC "Moscow Refinery"
Moscow |
Detailed Design Documentation | 2001 | Revamped in 2002 |
Increase in Hydrotreatment Capacity of Saratov Refinery to 2,000,000 tpy (3 versions) | OJSC "Saratov Refinery"
Saratov, OC "Sidanko" |
Technical and Commercial Proposal | 2002 | |
Hydroprocessing Complex for
OJSC "Khabarovsk Refinery" |
OC "Alliance" | Specifications for Design Development for LG&EC, South Korea | 2004 | |
Revamping of KGO Unit. Kerosene Cut Hydrotreating Section at OJSC "LUKOIL-Odessa Refinery" | JSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don |
Detailed Design Documentation | 2006 | Revamped in 2009 |
Constructiion of Wax Hydtrotreating Section of 40/3 Deoiling Unit at OJSC "LUKOIL-Nizhegorodnefteorgsyntez" | OJSC "LUKOIL-Nizhegorod-
nefteorgsyntez" Nizhniy Novgorod |
Detailed Design | 2007 | FAU “RF Glavgosexpertisa”’s favourable conclusion. Commissioned in 2010. Licensor – LLC "Katachim", Moscow |
Hydrotreating Reactor of Unit ЛЧ-24-2000 at
OJSC "Nizhegorodnefteorgsyntez" |
OJSC "LUKOIL-Nizhegorod-
nefteorgsyntez" Nizhniy Novgorod |
Technical Design | 2007 | |
Revamping of Unit ЛЧ-24-2000 aiming to change to production of diesel oil with sulfur content 10 ррm at OJSC "LUKOIL - Nizhegorodnefteorgsyntez" | OJSC "LUKOIL-Nizhegorod-
nefteorgsyntez" Nizhniy Novgorod |
Design Documentation Detailed Design Documentation | 2008 | FAU “RF Glavgosexpertisa”’s favourable conclusion Commissioned in 2010. Licensor – UOP |
Revamping of Diesel-Oil Hydrotreatment Unit Л-24/7 at OJSC “Kuibyshev Refinery” |
OJSC "Samaraneftekhimproect" Samara |
Design Documentation Detailed Design Documentation | 2010 | FAU "RF Glavgosexpertisa"’s favourable conclusion |
Diesel-oil Hydrotreating Unit at LLC "Afipsky Refinery" | LLC "Afipsky Refinery" | Follow-up of Basic Design Acceptance | 2012 | Licensor – Haldor Topsoe |
Combined Diesel Oil Hydrotreatment Unit and Hydrogen Production Unit PGV-2000 at
LLC "Afipsk Refinery" |
LLC "Afipsk Refinery" | Design Documentation | 2013 | |
Updating of the working documentation with the view of separate start and operation of Hydrotreatment Section of the Combined Vacuum Gas Oil Hyrocracking, and Diesel Oil and Kerosene Hydrotreatment Unit (GKGO-500/1000) at
OJSC “Khabarovsk Oil Refinery” |
OJSC "Khabarovsk Oil Refinery" OC ALLIANCE |
Detailed Design Documentation | 2013 | |
Revamping of Hydrotreatment Section at Catalytic Reforming Unit at OJSC "Khabarovsk Oil Refinery" | JSC "NNK-Khabarovsk Oil Refinery" | Design Documentation Detailed Design Documentation | 2014 | Approved by Federal Independent Institution "Glavgosexpertiza of Russia" |
Modernization of motor oil production in order to provide Euro 4 and 5 quality at Astrakhan Gas Processing Plant. Diesel Oil Hydrotreatment Unit У-1.732 | LLC "NIPI NG "Peton"
Ufa |
Detailed Design Documentation | 2014 | |
Revamping of VGO Hydrotreatment Unit of workshop No. 9 at OJSC "Gazprom neftekhim Salavat" | OJSC "Gazprom neftekhim Salavat" | Development of initial data | 2015 | |
Diesel Oil Hydrotreatment Unit at LLC Afipsk Refinery with capacity 3,3 mln tpy (of feed) | LLC "Afipsk Refinery" | 2018 | Licensor – Haldor Topsoe |
Facility | Client | Development Stage | Year | Remark |
850,000 tpy Diesel Oil Hydrodewaxing Unit (GDS-850) of OJSC "LUKOIL-Ukhtaneftepererabotka" | OJSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don |
Detailed Design | 2001 | Commissioned in 2003 Licensor – Süd-Chemie |
Elaboration of detailed design documentation on revamping of reactor section of unit GDS-850 aiming to produce diesel oil with sulfur content 10 ppm and capacity increase to 1.1 million tpy at OJSC "LUKOIL-Ukhtaneftepererabotka" | OJSC "LUKOIL- Nizhegorodniinefteproekt" Nizhniy Novgorod | Detailed Design Documentation | 2011 | FAU “RF Glavgosexpertisa”’s favourable conclusion
Licensor – Süd-Chemie |
Hydroisodewaxing unit of hydrocracked residue with production of group II and III base oils at LLC “Gazpromneft-SM” – “Omsk lubes production plant” | LLC “Gazpromneft-SM” - “OZSM” | Follow-up and Acceptance of Basic Design | 2014 | Licensor – ExxonMobil |
Complex of Hydroisodewaxing unit of hydrocracked residue with production of group II and III base oils at LLC "Gazpromneft-SM" – "Omsk lubes production plant" | LLC "Gazpromneft-SM" - "OZSM" | Design Documentation Detailed Design Documentation | 2016 | FAU “RF Glavgosexpertisa”’s favourable conclusion
Licensor –ExxonMobil |
Facility | Client | Development Stage | Year | Remark |
Upgrading of Л-24/8С Unit for vacuum gas oil light hydrocracking process | OJSC "Syzran Refinery" Syzran, OC YUKOS | Technical and Commercial Proposal | 1999 | |
Upgrading of Л-24/6 Unit for light vacuum gas oil hydrocracking process | OJSC "Kuibyshev Refinery" Samara, OC YUKOS | Technical and Commercial Proposal | 1999 | |
Upgrading of Syzran Refinery Л-24/8С Unit
OJSC "Syzran Refinery" for the light vacuum gas oil hydrocracking process |
Volgogard Company "Neftezavodmontazh"
Volgograd |
Detailed Design | 2000 | Commissioned in 2001 Licensor – Criterion |
Vacuum Gas Oil Hydrocracking Unit within Hydroprocessing Complex at Khabarovsk Refinery |
Alliance Group
|
Feasibility Study (studiya proekt) | 2004 | |
Upgrading of Л-24/8С Unit at OJSC "Syzran Refinery" with increasing capacity to
850 000 t/y |
OJSC "Syzran Refinery" Syzran, OC Rosneft | Detailed Design Documentation | 2010 | Commissioned in 2011 Licensor – Criterion |
Facility | Client | Development Stage | Year | Remark |
Reconstruction of C-100 at КТ-1/1 Complex |
OJSC "Gazpromneft - Omsk Refinery” | Justification of Investments | 2012 | |
Combined Unit G-43/107 at OJSC “Gazpromneft - Moscow Refinery” |
OJSC “Gazpromneft - Moscow Refinery” | Follow-up and Acceptance of Basic Design | 2014 | |
Revamping of Combined Catalytic Cracking Unit
G-43-107 at OJSC “Gazpromneft - Moscow Refinery” |
OJSC “Gazpromneft - Moscow Refinery” | Design Documentation Detailed Design Documentation | 2014 | FAU "RF Glavgosexpertisa"’s favourable conclusion Licensor – Axens |
Facility | Client | Development Stage | Year | Remark |
1,000,000 tpy Gasoline Cut Mixture Catalytic Reforming Unit | Turkmenbashi Refinery
Turkmenbashi, Turkmenia |
Technical and Commercial Proposal | 1996 | |
Revamping of Л-35-11/300 Unit to increase its capacity to 450,000 tons/year | OJSC "Moscow Refinery"
Moscow |
Technical and Commercial Proposal | 1996 | |
Addition of Pre-contactor and Revamping of Heater Section at Л-35-11/300 Unit | Tuapse Refinery
Tuapse, OC Rosneft |
Check Calculations and Detailed Design Documentation | 1996 | Revamped in 1998 |
Revamping of Reactor and Heater section of Л-35-11/300 Unit | OJSC "Moscow Refinery"
Moscow |
Detailed Design Documentation | 1996 | Commissioned in 1997
Licensor – UOP |
Replacement of Л-35-11/300 NHT Reactor | OJSC "Moscow Refinery"
Moscow |
Detailed Design Documentation | 1996 | Mounted in 1997 |
Revamping of ЛЧ-35-11/1000 Catalytic Reforming Unit for Seidinsk Refinery (Chardzhou) | GRIMMA Company
FRG |
Technical and Commercial Proposal | 1997 | |
Revamping of Л-35-11/300 Unit to increase its capacity to 400,000 tpy | Tuapse Refinery
Tuapse, OC Rosneft |
Technical and Commercial Proposal | 1997 | |
Gas Recovery Section of Reforming Unit with capacity of 20,000 tpy | TPP "LUKOIL-Uraineftegaz"
Urai |
Detailed Design | 1997 | Commissioned in 1998 |
Regeneration Gas Treatment Section in
Л -35-11/300 Unit |
Tuapse Refinery
Tuapse, OC Rosneft |
Detailed Design Documentation | 1998 | Сommissioned in 1998 |
Replacement of Reactor Effluent Separator of NHT Section in Л-35- 11/300 Unit | LLC "KINEF"
Kirishi, Leningrad Region |
Technical and Commercial Proposal | 1998 | |
Replacement of Separator in Л-35-11/300 Unit | LLC "KINEF"
Kirishi, Leningrad Region |
Detailed Design | 1999 | Mounted in 1999 |
Upgrading of ЛЧ-35-11/600 Unit | LLC "KINEF"
Kirishi, Leningrad Region |
Technical and Commercial Proposal | 1999 | |
500,000 tpy Catalytic Reforming Unit with NHT Section | OJSC "Komsomolsk Refinery"
Komsomolsk-on-Amur, OC Rosneft |
Justification of Investments | 1999 | |
Control system upgrading of ЛЧ–35-11/1000 Unit | LLC "KINEF"
Kirishi, Leningrad Region |
Technical and Commercial Proposal | 1999 | |
Revamping of Л-35-8/З00B Aromatic Hydrocarbons Unit for LLC "LUKOIL-Volgogradneftepererabotka" | UOP
Great Britain |
Feasibility Study | 1999 | |
Revamping of CR-1 Catalytic Reforming Unit, AD "LUKOIL-Neftochim", Bourgas, Bulgaria | OJSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don |
Process Part of Business Plan | 2000 | |
Revamping of Л-35-8/300-B Unit to increase benzene yield | LLC "LUKOIL-Permnefteorgsyntez"
Perm |
Feasibility Study | 2000 | |
1,000,000 tpy Catalytic Reforming Unit with Afterfractionating Section (PR- 22-35-11/1000) for "LUKOIL-Volgogradneftepererabotka" | OJSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don |
Detailed Design | 2000 | Commissioned in 2006
Licensor– UOP |
Upgrading of Л-35-11/300 Unit | OJSC "Saratov Refinery"
Saratov, OC Sidanko |
Justification of Investments | 2001 | |
Revamping of ЛГ-35-11/300 Catalytic Reforming Unit | OJSC "LUKOIL-Odessa Refinery"
Odessa, Ukraine |
Process Calculations and Assignment for supply of PACKINOX Heat-Exchanger | 2001 | |
Revamping of ЛГ-35-11/300 Catalytic Reforming Unit at OJSC "LUKOIL-Ukhtaneftepererabotka" | UOP
Great Britain |
Feasibility Study | 2001 | |
Upgrading of ЛГ-35-11/300 Catalytic Reforming Unit to increase its capacity to 380,000 tpy at OJSC "LUKOIL-Ukhtaneftepererabotka" | OJSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don |
Detailed Design | 2002 | Commissioned in 2004
Licensor – UOP |
Hydrotreating Sections of Catalytic Reforming Units | OJSC "Syzran Refinery"
Syzran, OC Rosneft |
Recommendations regarding equipment protection against corrosion and salt formation | 2002 | |
Hydrogen-Rich Gas Drying Section and Hydrotreating and Reforming Catalyst Regeneration Section of VR-650 Unit | LLC "LUKOIL-Western Siberia"
Uraineftegaz Refinery |
Detailed Design Documentation | 2002 | Mounted in 2003 |
Protection of Catalytic Reforming Equipment against Organic Chloride Corrosion | OJSC "Syzran Refinery"
Syzran, OC Rosneft |
Design | 2002 | Mounted in 2003 |
Revamping of Л-35-8/300Б Unit to increase its capacity to 400,000 tpy | LLC "LUKOIL-Volgogradneftepererabotka"
Volgograd |
Detailed Design | 2002 | Commissioned in 2003
Licensor – UOP |
Upgrading of Unit ЛГ-35-11/600. Calculation of sulfur trap pipe system | OJSC "Khersonnefte-pererabotka"
Kherson, Ukraine |
Calculations and detailed design documentation | 2002 | Commissioned in 2003
Licensor – VNIINeftechim, St. Petersburg |
Installation of feed heat- exchanger of PAKINOX type in Reforming Section of ЛГ-35-11/300-95 Unit | OJSC "LUKOIL-Odessa Refinery"
Odessa, Ukraine |
Detailed Design Documentation | 2003 | Installation completed in February 2004 |
Upgrading of Unit Л-35-11/600. Recommendations on operation of heaters P-201 and P-202 for capacity Qmin =250 000 tons/year and Qmax=350 000 tons/year | OJSC "Kherson-neftepererabotka"
Kherson, Ukraine |
Recommendations | 2003 | |
Upgrading of Unit Л-35-11/600. Recommendations on operation of Unit Л-35-11/600 at pressure 18 kgf/cm2 (gage) in the last reactor of Catalytic Reforming section for capacity Qmin =250 000 tons/year and Qmax=350 000 tons/year | OJSC "Kherson-neftepererabotka"
Kherson, Ukraine |
Recommendations | 2003 | |
Upgrading of Unit ЛГ-35-11/300-95 to increase capacity to 450,000 tons/year (based on feed flow rate) | OJSC "Khabarovsk Refinery"
OC Alliance |
Basic Design (using Criterion catalyst) | 2003 | Licensor – Criterion |
Automated process control system of Units ЛГ-35-UVPB for LUKOIL-Odessa Refinery | OJSC "LUKOIL-Odessa Refinery"
Odessa, Ukraine |
Detailed Design | 2004 | Mounted in 2005 |
Upgrading of section 200 "Catalytic Reforming" of Unit ЛK-6U and construction of "Recontact" Section | LLC "PetroKazakhstan Oil Products"
Shymkent, Republic of Kazakhstan |
Detailed Design Documentation | 2004 | Detailed Design Documentation on the 1st stage was handed over to the Refinery. Financing was suspended
Licensor – UOP |
Installation and piping of the reciprocating compressor for Unit ЛГ-35-11/300 at
OJSC "LUKOIL-Odessa Refinery" |
OJSC "LUKOIL-Odessa Refinery"
Odessa, Ukraine |
Detailed Design Documentation | 2007 | |
Revamping of Unit ЛЧ-35/11-600 aiming to reduce pressure and construction of benzene cut separation unit at OJSC "Syzran Refinery" | OJSC "Syzran Refinery"
Syzran, OC Rosneft |
Detailed Design | 2007 | FAU "RF Glavexpertiza" positive conclusion.
Commissioned in 2011. Licensor – Axens |
Revamping of Catalytic Reformer Unit ЛГ-35-11/300 to increase capacity from 300000 to 450 000 t/y at OJSC "Khabarovsk Refinery" | OJSC "Khabarovsk Refinery"
OC Alliance |
Detailed Design Documentation | 2007 | 1st phase – uniy was brought to capacity 350 000 t/y in 3rd quarter 2010
Licensor – Criterion |
748 000 t/y catalytic reforming unit with continuous catalyst regeneration | OJSC "NPK-Galychina"
Ukraine |
Design Documentation Detailed Design Documentation | 2008 | Part of the documentation was developed. Finance suspended |
Piping of CRU plate heat exchanger in refinery complex ЛК-6У in LLC "PetroKazakhstan Oil Products" | LLC "PetroKazakhstan Oil Products"
Shymkent, Republic of Kazakhstan |
Detailed Design Documentation | 2010 | Mounted in February 2011 |
Revamping of Unit Л-35/11-1000 at Kuibyshev Refinery aimed to operate at reduced pressure in reformer section |
OJSC "Samaraneftekhimproect"
Samara |
Design Documentation Detailed Design Documentation | 2010 | FAU “RF Glavgosexpertisa”s favourable conclusion |
Revamping of heater section of unit ЛГ-35-11/300-95 at LLC "LUKOIL-Ukhtaneftepererabotka" | LLC "LUKOIL-Nizhegorodniinefteproject"
Nizhniy Novgorod |
Detailed Design Documentation | 2012 | Commissioned in 2012 |
Revamping of Hydrotreatment Section at Catalytic Reforming Unit at OJSC "Khabarovsk Oil Refinery" | OJSC "Khabarovsk Oil Refinery" | Design Documentation Detailed Design Documentation | 2014 | |
Modernization of motor oil production in order to provide Euro 4 and 5 quality at Astrakhan Gas Processing Plant. Diesel Oil consisting of:
- Catalytic Reforming Unit У-1.734; - Benzol Cut Recovery Block |
LLC "NIPI NG "Peton"
Ufa |
Detailed Design Documentation | 2014 |
Facility | Client | Development Stage | Year | Remark |
Unit for Removing Hydrogen Sulfide from Off-Gases of the VNIINP-714 Additive Production Unit at Yaroslavl Refinery named after Mendeleev | JSC "Oils and Additives Producers"
Moscow |
Detailed Design | 1993 | Construction suspended in 1995 due to lack of finance |
Upgrading of Synthesis Gas Potash Treatment Unit | JSC "Akron"
Novgorod |
Technical and Commercial Proposal, and Detailed Design | 1996 | Completed in 1998 |
Facility | Client | Development Stage | Year | Remark |
Provision of Services for Ordering Equipment for PI-200 Isomerization Unit and Work Coordination on Use of Existing Parex-2M Unit Equipment in PI-200 Unit | JSC "Permnefteorgsyntez"
Perm JSC "Lengiproneftekhim" St. Petersburg |
Procurement | 1993 | |
PI-200 Unit. Hydrotreating Reactor | JSC "LUKOIL-Permnefteorgsyntez"
Perm |
Detailed Design | 1994 | |
PI-200 Unit. Stack. Unit Heaters. Process part of the Process Operating Regulations for Hydrotreating Section Design | JSC "LUKOIL-Permnefteorgsyntez"
Perm |
Detailed Design | 1996 | |
Addition of 213,000 tpy Isomerization Unit to Л-35-11/300 Unit | OJSC "Moscow Refinery"
JSC "Korimos" Moscow |
Detailed Design | 2000 | |
Addition of 170,000 tpy С5/С6 Isomerization Unit to Catalytic Reforming Unit | Petrotel-LUKOIL Refinery
Romania |
Detailed Design | 2000 | Commissioned in 2001
Licensor – UOP |
Isomerization and Oligomerization Units | "LINOS" Company | Feasibility Study | 2002 | |
120,000 tons/year Isomerization Unit PI-DIH/120 | OJSC "LUKOIL-Odessa Refinery"
Odessa, Ukraine |
Detailed Design | 2003 | Commissioned in August 2004
Licensor – UOP |
50,000 tpy n-butane Isomerization Unit | AD "LUKOIL Neftochim Bourgas"
Bulgaria |
Detailed Design Documentation | 2004 | Commissioned in 2008
Licensor – Axens |
IBP-85°С Cut Isomerization Unit with Feed-preparation and Deisopentanization sections of capacity 80.000 tons/year | OJSC "Khersonnefte-pererabotka"
Kherson, Ukraine |
Detailed Design | 2004 | Approvals package was. submitted for approval in 2006. Finance suspended. |
Isomerization Unit with DHT, Hydrogenation and Deisogexanation PGI-DIH/280,
OJSC "Syzran Refinery" |
OJSC "Syzran Refinery"
Syzran, OC Rosneft |
Detailed Design | 2006 | FAU "RF Glavexpertiza" positive conclusion.
Commissioned in 2011. Licensor – Axens |
Isomerization Unit with NHT, Hydrogenation and Deisohexanization sections PGI-DIH/280-K at Kuibyshev Refinery | OJSC "Samara-
neftekhimproekt" Samara |
Design and Detailed Design Documentation | 2009 | FAU "RF Glavexpertiza" positive conclusion.
Commissioned in September 2014 Licensor – Axens |
С5-С6 Cut Isomerization Unit at
OJSC “Novokuibysevsk Refinery” |
OJSC "Samara-
neftekhimproekt" Samara |
Technical assistance during Basic Design Acceptance | 2009 | Licensor – Axens |
Low-temperature Isomerization Complex with NHT, Hydrogenation and Deisohexanization sections PGI-DIH/280-NK at
OJSC "Novokuibyshevsk Refinery" |
OJSC "Samara-
neftekhimproect" Samara |
Design and Detailed Design Documentation | 2010 | FAU “RF Glavgosexpertisa” favourable conclusion Commissioned in February 2015 Licensor – Axens |
Pentane-Hexane Cut Isomerasation Unit ПГИ-434 at
OJSC "Gaspromneftechim Salavat" |
OJSC "Salavatneftekhim-
remstroy" Salavat |
Design and Detailed Design Documentation | 2012 | FAU “RF Glavgosexpertisa” favourable conclusion Commissioned in 2017 Licensor – Axens |
Facility | Client | Development Stage | Year | Remark |
Conversion of Л-35-5 Unit for Isoselectoforming Process | JSC "Ufaneftekhim"
Ufa, Bashkiria |
Technical and Commercial Proposal | 1997 | |
Conversion of Л-35-11/300 Unit (OJSC "Kuibyshev Refinery") to Isoselectoforming Process | NPP "Petrotech"
St. Petersburg |
Check Calculations of Equipment and Detailed Design Documentation | 1999 | Converted in 1999 |
Facility | Client | Development Stage | Year | Remark |
Engineering services for construction of H2S Recovery Unit at OJSC "Khabarovsk Oil Refinery" | Tecnimont KT Italy | Detailed Design Documentation | 2011 | Commissioned in May 2016 Licensor – Tecnimont |
Sulphur Recovery Unit (SRU-2) at JSC Gazpromпeft-Moscow Refinery | Saipem S.p.A. Italy | Detailed Design Documentation Engineering services | 2020 | Licensor – Kinetics Technology |
Facility | Client | Development Stage | Year | Remark |
20,000 tpy Hydrogen Production Unit at Khabarovsk Oil Refinery | Alliance Group | Feasibility Study (Studiya proekt) | 2009 | Licensor – Foster Wheeler |
Hydrogen Recovery Unit at LCC "Afipsky Refinery" | LLC "Afipsky Refinery" | Follow-up of Basic Design Acceptance | 2012 | Licensor – Haldor Topsoe |
Facility | Client | Development Stage | Year | Remark |
Delayed Coker Unit, Refinery LLC "LUKOIL-Nizhegorodnefteorgsintez", Kstovo | McDermott,
Netherlands |
Detailed Design Documentation Procurement support | 2019 |
Facility | Client | Development Stage | Year | Remark |
10,000 to 15,000 tpy Marketable Oil Production Section | CJSC "Dalneft"
Komsomolsk-on-Amur |
Basic Design | 1993 | |
10,000 to 15,000 tpy Marketable Oil Production Section | JSC "LUKOIL-Service"
Moscow |
Standard Design | 1993 | |
Marketable Oil Production Section | JSC "Atyrau Refinery"
Atyrau |
Technical Proposal | 1997 |
Facility | Client | Development Stage | Year | Remark |
Combined 70-360°С Wide Distillate Cut Hydrotreating and Catalytic Reforming Unit | JSC "LUKOIL-Kogalymneftegaz"
Kogalym |
Basic Design | 1993 | |
Combined Catalytic Reforming and Isomerization Unit for North Africa region | "Grimma" Company
Germany |
Technical and Commercial Proposal | 1999 | |
Combined 70-360°С Long distillate Hydrotreating Unit and Catalytic Reforming | JSC "LUKOIL-Western Siberia" Refinery within "Kogalymneftegaz" Company, Kogalym | Detailed Design Documentation | 2002 | Commissioned in March 2005 |
Combined 70-360°С Long Distillate Hydrotreating and Catalytic Reforming Unit | JSC "LUKOIL-Western Siberia" Refinery within "Kogalymneftegaz" Company, Kogalym | Process Operating Regulations | 2004 | |
Construction of Hydroprocessing Complex at Khabarovsk Oil Refinery consisting of:
- 500,000 tpy Diesel Oil and Kerosene Hydrotreatment Unit - 1,200,000 tpy Vacuum Gas Oil Hydrocracking Unit - Combined Amine Regeneration, SWS and Sulphur Production Unit with 13,000 tpy capacity (granulated sulfur) - 20,000 tpy Hydrogen Production Unit |
Alliance Group | Feasibility Study (studiya proekt) | 2004 | Hydrogen Production Unit сommissioned in July 2014 Vacuum Gas Oil Hydrocracking Unit сommissioned in July 2015 |
Combined Motor Fuel Production Unit at LANAZ Bitumen & Oil Refinery (Erbil, Republic of Iraq) | OZEL ELEKTROLITIK BAKIR MAM. SAN. VE DIS TIC. A.S | Feasibility Study | 2018 | |
Combined n-butane Isomerization and iso-butane Dehydrogenation Unit | PJSC Omsky kauchuk"
(Omsk Rubber) |
Pre-design Study | 2019 | |
3rd and 4th construction stage of JSC “Novashahtinsk Oil Refinery”. Combined Hydrocracker and Hydrogen Production Unit in the scope of Advanced Oil Refining Complex | JSC “Novashahtinsk Oil Refinery” SRDI OG "PETON", Ufa | Follow-up of Basic Design Project Documentation Detail Design Documentation | 2021 |
Facility | Client | Development Stage | Year | Remark |
Reforming Platinum Catalysts Production | OJSC "OLCAT"
St. Petersburg |
Process Part of Detailed Design | 1994 |
Facility | Client | Development Stage | Year | Remark |
ZMТ-250 Motor Fuel Refinery | JSC "Lukoil-Kogalymneftegaz"
Kogalym |
Construction Feasibility Study | 1994 | |
ZMТ -200 Motor Fuel Refinery | ЧМЗ Production Corp.
Glazov, Udmurtia |
Construction Feasibility Study | 1996 | |
1,500,000 tpy Refinery | JSC "LUKOIL-Arktik-Tanker"
Murmansk |
Construction Feasibility Study | 1997 | |
ZMТ-500 Motor Fuel Refinery in Kopeisk | OJSC "Oil-Service"
Chelyabinsk |
Construction Feasibility Study | 1997 | |
500,000 tpy Motor Fuel Plant in Bolshoy Kamen | CJSC "Far East Oil Company" | Construction Feasibility Study Report | 1997 | |
Upgrading of Samotlor Refinery | Tyumen Oil Company
LLC "Nizhevartovsk Research and Production Corp." Nizhevartovsk |
Check Calculations of Equipment for Upgrading Project | 1999 | |
Upgrading of fuel production part at "Petrotel-LUKOIL" Refinery | LUKOIL-Romania
Bucharest, Romania |
Business Plan | 1999 | |
Upgrading of Ukhta Refinery | JSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don |
Development of Business Plan Process Part | 2000 | |
Construction of 3 million tpy Primorsky Refinery, Leningrad Region | OJSC "Mariisky Machine-Building Plant" | Preparation of Declaration of Intent for construction investment | 2001 | |
Rebuilding of Astrakhan gas processing plant in terms of design development of control system connection | Astrakhan gas processing plant
Astrakhan, OJSC "Gasprom" |
Detailed Design Documentation | 2003 | Commissioned in 2004 |
Motor fuel refinery,.construction stage II | LLC "LUKOIL-West Siberia"
Refinery within LLC "Kogalymneftegaz" Kogalym |
Updating of Feasibility Study | 2003 | |
Elaboration of proposals on development of crude oil refinery (1.8 mln and 2.5 mln tons/year of crude oil) | OJSC "Khersonnefte-pererabotka"
OC Alliance, Ukraine |
Proposals | 2003 | |
Declaration of Intent on investment in construction of oil refinery in Vyborg area of Leningrad Region | CJSC "VNP"
Vyborg |
Declaration of Intent | 2003 | |
Declaration of Intent on Investment in Construction of Advanced Processing Complex at OJSC "Khabarovsk Refinery" | OJSC "Alliance Group" | Declaration of Intent | 2004 | |
Feasibility Study (studiya "Proekt") for Construction of Hydroprocessing Complex at OJSC "Khabarovsk Refinery" | OJSC "Alliance Group" | Feasibility Study (studiya “PROEKT”) | 2004 | |
Declaration of Intent on Construction of 1,000,000 tons/year Oil and Gas Complex at Usinsk Region of Komi Republic | LLC "Usinsk Refinery"
Usinsk |
Declaration of Intent | 2006 | |
BEDD preparation for design of 2 million tpy Ulan-Bator Refinery | "Vostokneftegas" Company | Feasibility Study | 2006 | |
Pre-engineering study, collection and preparation of basic data for construction of Tyumen Refinery with 3 million tpy capacity | LL "Tekhneftinvest"
Tyumen |
Pre-engineering study | 2007 | |
Pre-design preparation for construction of gas-condensate processing plant with capacity 600,000 tpy in Tikhvin | LLC "AVRO" | Pre-engineering study | 2007 | |
Phased transfer of Khabarovsk Refinery consumers to natural gas use | OJSC "Khabarovsk Refinery"
OC Alliance |
Technical and economic estimation | 2007 | |
Pre-engineering study and elaboration of technical and economic estimation for 2.5 million tpy refinery in Volkhov | LLC "Volkhovneftekhim"
Volkhov |
Pre-engineering Study Technical and Economic Estimation | 2007 | |
Updating of Feasibility Study (studiya "PROEKT") to split Hydroprocessing Complex construction in the process of revamping OJSC "Khabarovsk Refinery" into 4 phases | OJSC "Khabarovsk Refinery"
OC Alliance |
Feasibility Study (studiya “PROEKT”) | 2008 | |
Execution of General Designer functions at Chudovo Refinery | LLC "AVRO" | 2008 | ||
Reconstruction of LLC "Ilskiy Refinery" | LLC "Ilskiy Refinery" | Technical and Economic Calculation | 2012 | |
Delayed Coker Unit, Kstovo Refinery | McDermott,
Netherlands |
Technical and Economic Calculation | 2019 |
Facility | Client | Development Stage | Year | Remark |
Off-Site Facilities of ZMT-250 Motor Fuel Refinery | JSC "LUKOIL-Kogalymneftegaz"
Kogalym |
Detailed Design Documentation | 1995 | Commissioned in 1997 |
Unit for Treating Drip Oil and Oil Sludge | Turkmenbashi Refinery
Turkmenbashi, Turkmenia |
Technical and Commercial Proposal | 1996 | |
Recycling Water Supply Unit | Turkmenbashi Refinery
Turkmenbashi, Turkmenia |
Technical and Commercial Proposal | 1997 | |
Oil Products Metering Unit | LLC "LUKOIL-Uraineftegaz"
Urai |
Detailed Design Documentation | 1997 | Commissioned in 1998 |
Feedstock Supply Unit at the Catalytic Reforming Unit | LLC "LUKOIL-Uraineftegaz"
Urai |
Detailed Design Documentation | 1997 | Commissioned in 1998 |
Light Oil Products Loading Rack | JSC "Korimos"
Moscow |
Detailed Design | 1998 | Commissioned in 1999 |
Gas Distributing Point. Upgrading | Stabilizatsia Company
Nizhevartovsk |
Detailed Design | 1998 | Commissioned in 1999 |
Flare System. Upgrading | OJSC "Cracking"
Saratov, OC Sidanko |
Technical and Commercial Proposal | 1999 | |
Chemical Laboratory. Upgrading | Volgograd Company "Neftezavodmontazh"
LLC "Nizhevartovsk NPO" Nizhevartovsk, TNK-BP |
Detailed Design | 1999 | Commissioned in 2000 |
Feedstock and Saleable Product Tank Farms with Pump Stations for pumping feedstock and oil products of USN 4-2 Unit | Volgograd Company "Neftezavodmontazh"
LLC "Nizhevartovsk NPO" Nizhevartovsk, TNK-BP |
Detailed Design | 1999 | Commissioned in 2001 |
Hydrogen-Rich Gas Concentration Unit. Booster Compressor Station | OJSC "LUKOIL-Permnefteorgsyntez"
Perm |
Detailed Design | 2000 | Commissioned in 2002 |
Nitrogen and Oxygen Generation Station and Diesel Fuel PPD Addition Section (USN 4-2) | LLC "Nizhevartovsk Oil Refining Corp." | Detailed Design | 2002 | |
Off-site facilities of ZMT-250 Motor Fuel Refinery (storage facilities, additive injection section and air compressor station) | JSC "LUKOIL-West Siberia"
Oil Refinery within LLC "Kogalymneftegaz" Kogalym |
Detailed Design Documentation | 2003 | Commissioned in March 2005 |
Upgrading of Heating Center No. 1, workshop No.14 for LLC "Kirishinefteorgsyntez" | LLC "Proekt-Technology"
St. Petersburg |
Detailed Design Documentation | 2004 | Commissioned in 2006 |
Construction of Central laboratory at
OJSC "Syzran Refinery" |
OJSC "Syzran Refinery"
Syzran |
Feasibility Study (studiya “PROEKT”) Detailed Design Documentation | 2006 | Commissioned in 2007 |
MTBE Production Complex at OJSC “Syzran Refinery”. Amenity building with distribution substation | OJSC “Syzran Refinery”
Syzran
|
Design Documentation Detailed Design Documentation | 2011 | FAU “RF Glavgosexpertisa” favourable conclusion
Licensor - Axens
|
MTBE Production Complex at OJSC “Syzran Refinery”. Methanol storage and MTBE storage | OJSC “Syzran Refinery”
Syzran
|
Design Documentation Detailed Design Documentation | 2011 | FAU “RF Glavgosexpertisa” favourable conclusion
Licensor - Axens
|
MTBE Production Complex at OJSC “Syzran Refinery”. Intermediate butane-butylene cut tank farm. Intermediate MTBE tank farm | OJSC “Syzran Refinery”
Syzran
|
Design Documentation Detailed Design Documentation | 2011 | FAU “RF Glavgosexpertisa” favourable conclusion
Licensor - Axens
|
MTBE Production Complex at OJSC “Syzran Refinery”. Interconnecting piping lines | OJSC “Syzran Refinery”
Syzran
|
Design Documentation Detailed Design Documentation | 2011 | FAU “RF Glavgosexpertisa” favourable conclusion
Licensor - Axens
|
Control room building with transformer substation, intermediate tank farm and interconnecting piping lines for connection of Pentane-Hexane Cut Isomerization Unit PGI-434 at OJSC “Gazprom neftekhim Salavat” | OJSC “Salavatneftekhimremstroy” | Design Documentation Detailed Design Documentation | 2012 | FAU “RF Glavgosexpertisa” favourable conclusion
Under construction
Licensor - Axens
|
Firefighting pump house with fire tanks as part of Pentane-Hexane Cut Isomerization Unit PGI-434 at OJSC “Gazprom neftekhim Salavat” | OJSC “Salavatneftekhimremstroy” | Design Documentation Detailed Design Documentation | 2012 | FAU “RF Glavgosexpertisa” favourable conclusion
Under construction
Licensor - Axens
|
Complex of Diesel Oil Hydrotreatment Units at
LLC "Afipsk Refinery". Off-site facilities
|
LLC "Afipsk Refinery" | Design Documentation | 2013 | |
Modernization of motor oil production in order to provide Euro 4 and 5 quality at Astrakhan Gas Processing Plant. Off-site facilities | LLC "NIPI NG "Peton"
Ufa |
Detailed Design Documentation | 2014 | |
Technical revamping of 1st phase at Orenburg Gas Processing Plant. Off-site facilities | CJSC "Gazprom Invest Yug" LLC "SRDI OG "Peton", Ufa |
Design Documentation | 2016 | |
LNG production, storage and unloading complex at KS Portovaya. Off-site facilities: - Administrative and service area - Chemical storage area | CJSC "Gazprom Invest" Linde AG LLC "SRDI OG "Peton", Ufa |
Design Documentation Detailed Design Documentation | 2016 | |
Complex of Hydroisodewaxing Unit of hydrocracked residue with production of group II and III base oils at LLC "Gazpromneft-SM" – "Omsk lubes production plant". Off-site facilities | LLC "Gazpromneft-SM" - "OZSM" | Design Documentation Detailed Design Documentation | 2016 | |
Amursky Gas Processing Plant. Off-site facilities | LLS TECNIMONT RUSSIA | Design Documentation Detailed Design Documentation | 2018 | |
Ethane-containing gas processing complex in the area of Ust' Luga. Gas processing and gas-chemical plants, gas-chemical complex. Off-site facilities | LLC "SRDI OG Peton" | Pre-FEED | 2018 | |
3rd and 4th construction stage of JSC “Novashahtinsk Oil Refinery”. Off-site facilities in the scope of Advanced Oil Refining Complex | JSC “Novashahtinsk Oil Refinery” "SRDI OG "PETON", Ufa |
Pre-FEED | 2020 |
Facility | Client | Development Stage | Year | Remark |
Revamping of LI-150V Unit for MTBE production with capacity of 200,000 tpy | JSC "Korimos"
Moscow |
Detailed Design | 1994 | Commissioned in 1995 Licensor – OJSC "Yarsyntes", Yaroslavl |
Section for Removing Methanol from Butane-Butylene Cut in MTBE production Unit | JSC "Korimos"
Moscow |
Detailed Design | 1995 | Commissioned in 1995 |
Re-planning to Compressor House, Transformer Substation and Control Room at the MTBE Unit | JSC "Korimos"
Moscow |
Detailed Design | 1995 | Commissioned in 1996 |
Propylene Complex | Novokuibyshevsk Petrochemical Plant
Samara Region, Novokuibyshevsk |
Technical and Commercial Proposal | 1996 | |
80,000 tpy Oligomerization Unit | JSC "Korimos"
Moscow |
Detailed Design | 1996 | Commissioned in 1997 Licensor – OC "VNIIOS", Novokuibyshevsk |
Conversion of Propylene Hydroformylation Section producing butyl alcohol and 2-ethyl hexanol to process using rhodium catalyst | OJSC "Interchimprom-Oxosyntez"
Perm |
Technical and Commercial Proposal | 1997 | |
Addition of Equipment to MTBE Unit under General Explosion Safety Rules (PB 09-170-97) | JSC "Korimos"
Moscow |
Detailed Design | 1998 | Completed in 1999 |
Revamping of EP-60 Unit for MTBE production (Salavat, Bashkiria) | JSC "Korimos"
Moscow |
Detailed Design | 1998 | |
TAME Production Section. Additition of equipment to Oligomerization Unit within MTBE Unit | JSC "Korimos"
Moscow |
Detailed Design | 1999 | Commissioned in 1999 Licensor – OJSC "Yarsyntez", Yaroslavl |
200,000 tpy TAME Unit | JSC"Korimos"
Moscow |
Detailed Design | 2000 | Commissioned in 2002 Licensor – OJSC "Yarsyntez", Yaroslavl |
Feed-preparation Section for 200 000 tpy TAME Unit | JSC "Korimos"
Moscow |
Detailed Design Documentation | 2002 | Commissioned in 2003 Licensor – OJSC "Yarsyntez", Yaroslavl |
Combined Fuel Refining Unit KTD-200/720. Section 100 - TAME unit with Feed-Preparation section | JSC "Korimos"
Moscow |
Process Operating Regulations | 2003 | |
Addition of equipment to Reactor Section 100 of Combined Fuel Refining Unit KTD 200/720 | JSC "Korimos"
Moscow |
Detailed Design | 2007 | |
Major Repair of Combined MTBE and Oligomerizate Unit at JSC "Korimos" | LLC "Stroyinvest"
Moscow |
Detailed Design Documentation | 2007 | |
Major Repair of Section 100 "TAME Production" of Combined Fuel Refining Unit KTD 200/720 | JSC "Korimos"
Moscow |
Detailed Design Documentation | 2008 | |
MTBE Unit at OJSC "Kuibyshev Refinery" | OJSC "Samara-
neftekhimproekt" Samara |
Design and Detailed Design Documentation | 2010 | FAU “RF Glavgosexpertisa” favourable conclusion Licensor – OJSC "Yarsyntez", Yaroslavl Commissioned in July 2016 |
MTBE Unit at OJSC "Syzran Refinery" | OJSC "Samara-
neftekhimproekt" Samara |
Basic Design Acceptance | 2010 | Licensor – Axens |
MTBE Production Complex at OJSC "Syzran Refinery" | OJSC "Syzran Refinery"
OC Rosneft |
Detailed Design Documentation | 2011 |
FAU "RF Glavexpertisa" favourable conclusion Licensor – Axens |
Revamping of Combined Fuel Refining Unit KDT-200/720. Section 100 - TAME Unit with Feed Section aiming to increase capacity up to 50 t/h | OJSC “Gaspromneft-Mosxow Oil Refinery” | Design Documentation Detailed Design Documentation | 2015 | Licensor – Yarsyntez Company, Yaroslavl |
Revamping of MTBE Unit | OJSC “Gaspromneft-Mosxow Oil Refinery” | Design Documentation Detailed Design Documentation | 2015 | Licensor – Yarsyntez Company, Yaroslavl |
Ethylene production unit as part of gas-chemical plant in the area of Ust' Luga | LLC "SRDI OG Peton" | Pre-FEED | 2018 | Licensor – Linde AG |
PE, PP and LAO Units Amur Gas Chemical Complex (AGCC) | МТ – Russia, ОООTecnimont, Italy |
Detailed Design Documentation Engineering Services | 2020 | Licensors –
Univation Basell Axens |
Facility | Client | Development Stage | Year | Remark |
Crude Oil and Condensate Complex Hydrotreating Unit of Offshore Field Groups | Gasprom dobycha Krasnodar Ltd. | Design and Detailed Design Documentation | 2015 |
Facility | Client | Development Stage | Year | Remark |
Deethanization Gas Treatment Unit at Urengoy Plant Condensate Preparation for Transport on a turnkey basis (EPC contract) | Gasprom pererabotka Ltd.
NIPI NG Peton |
Detailed Design Documentation | 2015 | |
Revamping of booster compression station at Urengoy Plant of condensate preparation for transportation in order to supply feed to Novyi Urengoy Gas and Chemical Complex on a turnkey basis (EPC contract) | Gasprom pererabotka Ltd.
NIPI NG Peton |
Detailed Design Documentation | 2015 | |
NGL/NRU and Helium Concentrate Production Unit, Helium Fine Purification, Liquefaction and Filling Unit (Civil Engineering) | JSC "NIPIgas Pererabotka" LLC "SRDI OG Peton", Ufa |
Detailed Design Documentation | 2016 | |
LNG production, storage and unloading complex at Compressor Station Portovaya: - Instrument air section - Nitrogen recovery section - Flare system - Administrative and service area - Chemical storage area |
LLC "Gazprom Invest" LLC "SRDI OG Peton", Ufa |
Design Documentation Detailed Design Documentation | 2016 | FAU “RF Glavgosexpertisa” favourable conclusion |
Unit Fabrication at NOVATEC-Murmansk Refinery " (scope of AWP1A) | Velesstroy, ООО | Design Documentation Detailed Design Documentation | 2020 |
Facility | Client | Development Stage | Year | Remark |
Oil Terminal in Gatchina area | JSC "LUKOIL-St. Petersburg"
St. Petersburg |
Technical and Commercial Proposal | 1996 | |
Fuel Stations Network for JSC "LUKOIL-Tatarstan" | CJSC "Petroil"
Tatarstan |
Business Booklet | 1997 | |
Oil Terminal in Volkhov | LLC "Verona Torg"
Moscow |
Business Plan | 2001 | |
Tank Car Unloading Rack for Dark Oil Products at Oil Terminal in the Murmansk Sea Fishing Port | Giprorybflot | Approvals package of Detailed Design | 2002 | Financing suspended in view of change in shareholders |
Dark Oil Products Pumping Station in Murmansk Sea Fishing Port | Giprorybflot | Detailed Design | 2002 | |
Upgrading of the tank car loading rack for dark products | State-run Murmansk Fishing Port | Detailed Design Documentation | 2002 | Financing suspended in view of change in shareholders |
Bunkering depot of sea transshipment complex of Kirov plant. Engineering solutions | OJSC "Lenmorniiprojeckt"
St. Petersburg |
Detailed Design (Approvals package) | 2003 | |
Revamping of fuel storage No. 632 of North Fleet in settlement of Mokhnatkina Pakhta, Murmansk Region | LLC "Kommandit Service"
Murmansk |
Design offer | 2004 | |
Revamping of Khabarovsk petroleum storage depot of OJSC "Khabarovsk Nefteproduct" | OJSC "Khabarovsk Nefteproduct"
Khabarovsk, OC Alliance |
Detailed Design (Approvals package) | 2005 | FAU "RF Glavexpertiza" positive conclusion |
Revamping of Wastewater Treatment Facilities at Khabarovsk petroleum storage depot of OJSC” Khabarovsk Nefteproduct” | OJSC "Khabarovsk Nefteproduct"
Khabarovsk, OC Alliance |
Detailed Design | 2006 | |
Layout of Ust-Luga bunkering complex on the planned site | Fiona Trust and Holding Corporation | Pre-Design Proposals | 2007 | |
The second stage of revamping of Wastewater Treatment Facilities at Khabarovsk petroleum storage depot of OJSC "Khabarovsk Nefteproduct" | Khabarovsk Nefteproduct
OJSC "Khabarovsk Nefteproduct" Khabarovsk, OC Alliance |
Detailed Design Documentation | 2009 | |
Revamping of railway rack No.1 for light petroleum products unloading and construction of pump station for light petroleum products unloading on the territory of petroleum depot at OJSC "Primornefteprodukt", Vladivostok | OJSC "Primornefteprodukt", Vladivostok | Detailed Design Documentation | 2014 | |
Revamping of Slantsy Oil Terminal | LLC "NORDWESTTERMINAL" | Detailed Design Documentation | 2014 |
Facility | Client | Development Stage | Year | Remark |
Upgrading of Refrigerating Unit in Auxiliary Building | JSC "Baltika Brewery"
St. Petersburg |
Detailed Design Documentation | 1996 | Commissioned in 1996 |
Installation of Ventilation Equipment for Filling Line in Main Production Building | JSC "Baltika Brewery"
St. Petersburg |
Detailed Design Documentation | 1997 | Commissioned in 1997 |
Upgrading of Auxiliary Building. Carbon Dioxide Production | JSC "Baltika Brewery"
St. Petersburg |
Detailed Design Documentation | 1997 | Commissioned in 1998 |
Upgrading of Auxiliary Building. Installation of Refrigerant Tank | JSC "Baltika Brewery"
St. Petersburg |
Detailed Design Documentation | 1997 | Commissioned in 1998 |
Tie-In of Ammonia Refrigerating Station | JSC "DEKA"
Novgorod |
Detailed Design Documentation | 1997 | Commissioned in 1998 |
Upgrading of Auxiliary Building. Carbon Dioxide Production. Increase of Station Capacity | JSC "Baltika Brewery"
St. Petersburg |
Detailed Design Documentation | 1998 | Commissioned in 1999 |
Facility | Client | Development Stage | Year | Remark |
Electric Heat Tracing of Paraffin Solvent Production Unit (Electric Desalter, Atmospheric and Vacuum Distillation Unit, Bitumen Plant) and Off-Site Facilities | JSC "LUKOIL-Kogalymneftegaz"
Kogalym |
Detailed Design Documentation | 1995 | Commissioned in 1997 |
Electric Heat Tracing for Bitumen Plant of "Stroydetal" Company | "Viktoria" Company
St. Petersburg |
Detailed Design | 1997 | Commissioned in 1997 |
Electric Heat Tracing of Equipment, Pipelines and Floors of Open-Type Pump Stations of P-24-1400/1 Diesel Oil Hydrotreating Unit at LLC "LUKOIL-Volgogradneftepererabotka" | JSC "LUKOIL-Rostovneftekhimproekt"
Rostov-on-Don |
Detailed Design Documentation | 1997 | Commissioned in 2000 |
Upgrading of 1A/1M Catalytic Cracking Unit. JSC "Yaroslavl Refinery". Electric Heat Tracing | Raychem
The Netherlands |
Detailed Design | 1998 | Commissioned in 1999 |
Electric Heat Tracing of Pipelines for Facilities of Vostochno-Pridorozhnoye and Druzhnoye Fields | Oil-and-gas production department "Druzhbaneft"
Central Crude Accumulation Station Druzhnoye Kogalym |
Detailed Design | 1998 | Commissioned in 1999 |
Polycarbonate Flakes Production Facility. Electric Heat Tracing of Pipelines and Equipment. DOW Plant (Germany) | Raychem
The Netherlands |
Detailed Design | 1998 | Commissioned in 1999 |
Interplant Utility Lines. Electric Heat Tracing | Petersburg Oil Terminal
St. Petersburg |
Detailed Design | 1999 | Commissioned in 1999 |
Electric Heat Tracing of Cyclohexane Pipelines for OJSC "ERA" | JSC "Promteplomontazh"
Tosno, Leningrad Region |
Detailed Design | 1999 | Commissioned in 1999 |
Electric Heat Tracing of Pipelines at Norske Skog Golbey РМ2 Plant (Germany) | Raychem
The Netherlands |
Detailed Design | 1999 | Commissioned in 2000 |
Electric Heat Tracing of Oil Products Loading Rack Facilities for LLC "KINEF", Kirishi | JSC "Lengiproneftechim"
St. Petersburg |
Electrical Part of Detailed Design | 2000 | Commissioned in 2001 |
Electric Heat Tracing of Л-24/8с Unit at OJSC "Syzran Refinery" during revamping of Unit to light vacuum gas oil hydrocracking process | Volgograd Company “Neftezavodmontazh”, Volgograd | Detailed Design Documentation | 2001 | Commissioned in 2001 |
Electric Heat Tracing of Outside Racks at Bitumen Plant and Vacuum Gas Oil Tank Farm | Nizhekamsk Refinery | Detailed Design Documentation | 2001 | Commissioned in 2002 |
Electric Heat Tracing of Oil Fuel Supply and Discharge Pipelines for Phase III of Petersburg Oil Terminal Complex Expansion | LLC "Elix"
St. Petersburg |
Detailed Design | 2002 | Commissioned in 2002 |
Electric Heat Tracing of Hydrogen-Rich Gas Drying Section and Hydrotreating and Reforming Catalyst Regeneration Section of VR-650 Unit for LLC "Uraineftegaz" | TERMON Europa GmbH
Germany |
Detailed Design Documentation | 2002 | Commissioned in 2003 |
Electric Heat Tracing and Heat Insulation of Air and Instrument Air Lines at Sea Terminal in Novorossiysk | CJSC "Caspian Pipeline Consortium" | Detailed Design Documentation | 2002 | Commissioned in 2002 |
Electric heat tracing. Petersburg oil terminal. Extension stage IV. Railroad tank car unloading rack for light and dark petroleum products. Pumping station for petroleum product unloading. Interplant pipelines. Heat tracing | LLC "Elix"
St. Petersburg |
Detailed Design Documentation | 2003 | Commissioned in 2004 |
Oil fuel pipelines. Railroad Tank car unloading/loading rack Electric heat tracing | CJSC "Sigma"
St. Petersburg |
Detailed Design Documentation | 2004 | Commissioned in 2004 |
1 million tpy Catalytic Reforming Unit PR-22-35-11/1000 for LLC "LUKOIL-Volgogradnefterpererabotka". Electric heat tracing | OJSC "LUKOIL-Rostovneftechimproekt"
Rostov-on-Don |
Detailed Design Documentation | 2006 | Commissioned in 2006 |
Electric heat tracing of pipelines, impulse lines, cabinets, instrumentation, 4 open pumping stations of isomerization unit at
LLC "LUKOIL-Volgogradneftepererabotka" |
LLC "TECHENERGO-SERVICE" | Detailed Design Documentation | 2007 |
Facility | Client | Development Stage | Year | Remark |
Review of technical documentation for GKP 126/33 Unit, developed by Ventech company (USA) | LLC "LUKIOL-Western Siberia"
Kogalym |
Consultancy services during acceptance of design documentation and equipment | 2000 | |
Consultancy services on replacement of instrumentation mounting structures based on American standards for OJSC "LUKOIL-Permneftorgsyntez" Unit AVT-4 by structures of home manufacture based on Russian standards | LLC "Evrotek" | Consultancy services | 2007 | |
Consultancy services on application of Russian norms and regulations in design of Hydroprocessing Complex facilities at
OJSC "Khabarovsk Refinery" |
Tecnicas Reunidas
Spain |
Consultancy services | 2008 | |
Consultancy services on elaboration of design documentation by Customer at Straight-Run Fuel-ZPT-450 Refinery | LLC "Volkhovneftechim"
Volkhov, Leningrad Region |
Consultancy services | 2009 | |
Consultancy services on application of Russian norms and regulations in design of H2S Treatment Unit at OJSC "Khabarovsk Refinery" | Tecnimont KT
Italy |
Consultancy services | 2011 |
Facility | Client | Development Stage | Year | Remark |
Conformity of Motor Fuel Refinery design estimates prepared by TECHNIP, France, to Russian Federation norms and regulations | Volkhvy Company
Volkhov, Leningrad Region |
Expert Report | 1997 | |
Linde and Bateman-Glencore Proposals for High-Octane Blending Component Production Complex at Achinsk Refinery | SPE "Petrotech"
St. Petersburg |
Expert Report | 1997 | |
Expert report on detailed design of 30 m3 steel horizontal cylinder tank for petroleum product storage | CJSC "SANTECH"
St. Petersburg |
Expert Report | 1998 | |
JSC "Baltic Petroleum" Property Evaluation | ВР Marine Ltd.
Great Britain |
Expert Report | 1998 | |
Inspection of LLC "KomiBitum" and JSC "Crude Oil Treatment Complex Facilities" in Usinsk | OJSC OC KomiTEK
Moscow |
Expert Report based on inspection results | 1998 | |
Main lines of revamping heat supply sources in Leningrad Region | Government of Leningrad Region | Expert Report | 1998 | |
Possibility of converting unit L-35-11/1000 at Kuibyshev Refinery to isoselectoforming process | SPE "Petrotech"
St. Petersburg |
Expert Report | 1999 | |
Compliance of reactor RGDS 00.00.000 technical design developed by
OJSC "Volgogradneftemash" for Unit Л-24/6 at OJSC "Syzran Refinery" with norms and requirements for diesel oil hydrotreating process |
OJSC "Volgogradneftemash"
Volgograd |
Expert Report | 1999 | |
Expert report on detailed design "Gas Catalytic Production. Sulfur Recovery Unit. After-treatment of SRU off-gas" | JSC "Ufa Refinery"
Ufa |
Expert Report | 2000 | |
Industrial safety expertise for crude oil tank farm project | LLC "KINEF"
Kirishi, Leningrad Region |
Expert Report | 2002 | |
Industrial safety expertise of Feasibility Study (stadiya "PROEKT") of petroleum product distribution transshipment complex (LUKOIL II) | OJSC "LUKOIL-Nefteproduct"
Vysotsk, Leningrad Region |
Expert Report | 2002 | |
Industrial safety expertise of detailed design documentation on the first start-up complex of petroleum product distribution and transshipment | OJSC "LUKOIL-Nefteproduct"
Vysotsk, Leningrad Region |
Expert Report | 2004 | |
Industrial safety expertise for Units Design of Hydroprocessing Complex | LLC "KINEF"
Kirishi, Leningrad Region |
Expert Report | 2004 | |
Follow-up of industrial safety expertise of detailed design documentation on revamping of unit ЛЧ-24/2000 at LLC "LUKOIL-Nizhegorodnefteorgsyntez" aiming to transfer to diesel oil production with sulfur content 10 ррm | LLC "LUKOIL-Nizhegorodnefteorgsyntez"
Nizhniy Novgorod |
Follow-up of industrial safety expertise | 2011 |
Facility | Client | Development Stage | Year | Remark |
Provision of services on financial and technical survey during investment project implementation | Vnesheconombank (State Corporation "Bank of Development and Foreign-Economic Activity")
OJSC "Khabarovsk Refinery" |
Financial and technical survey | 2010 |
Facility | Client | Development Stage | Year | Remark |
Elaboration of purchasing documentation for realization of project “Deethanization Gas Treatment Unit at Urengoy Plant Condensate Preparation for Transport” on a turnkey basis (EPC contract) | Gasprom pererabotka Ltd. | Technical and Commercial Parts of Purchasing Documentation for Competitive Bidding for the Right to Make General Contractor Turnkey Construction Project | 2015 | |
Elaboration of purchasing documentation for realization of project “Revamping of Booster Compressor Station at Oil-and-Gas Chemical Integrated Plant” on a turnkey basis (EPC contract) | Gasprom pererabotka Ltd. | Technical and Commercial Parts of Purchasing Documentation for Competitive Bidding for the Right to Make General Contractor Turnkey Construction Project | 2015 |